contact · no forms, no gatekeeping

Book a discovery call

Fifteen minutes, mostly listening. Tell us your deadline and your study backlog, and we will tell you honestly whether we can help.

Grid line · in front of the meter

Interconnection studies

PRC-029-1 ride-through compliance, interconnection queue studies, and OEM model validation — EMT studies in PSCAD, delivered PE-stamped and built for grid-operator acceptance.

PRC-029-1 BES deadline · Oct 1, 2026
Email about an EMT study
Facility line · behind the meter

Short-circuit, coordination & arc-flash

Facility power studies in SKM / ETAP for data centers, industrial plants, hospitals, and campuses — the recurring studies OSHA, NFPA 70E, and NEC 110.24 already require.

NFPA 70E · reviewed at least every 5 years
Email about a facility study

Not sure which line you need? Data centers usually need both. Send either — we will sort it out on the call.

What happens next

Three steps from first email to a deliverable you can audit line by line. No open-ended engagements, no black boxes.

01

15-minute discovery call

Mostly listening: your deadline, your queue position, your study backlog. If we are not the right fit, we say so on the call — not after a month of scoping.

02

Scoped, fixed proposal

A clearly bounded scope of work with deliverables, assumptions, and timeline named up front — so you know exactly what you are getting before you commit to anything.

03

A pilot study you can judge us on

Start with one study. Every assumption, setting, and result is auditable line by line, and every study is delivered PE-stamped. Decide on evidence, not promises.

Who should reach out

If you own, build, or maintain power infrastructure with a study standing between you and a deadline, that is us.

  • IBR fleet operators — solar, wind, and storage owner-operators facing PRC-029-1 ride-through deadlines.
  • Data-center & mission-critical facility teams — EMT studies to connect, arc-flash and coordination for your own gear.
  • EPC & MEP electrical design firms — overflow and white-label studies capacity when your bench is full.
  • Developers in the interconnection queue — projects waiting on studies that decide whether they ever energize.
  • Industrial & commercial facility owners — recurring NFPA 70E and NEC compliance studies, on a schedule you can plan around.
  • Inverter & turbine OEMs — PSCAD model validation ahead of FERC Order 2023 requirements.

Prefer to skip the cards?

Write to us directly. A plain email with your project and your deadline is all it takes.