Fifteen minutes, mostly listening. Tell us your deadline and your study backlog, and we will tell you honestly whether we can help.
PRC-029-1 ride-through compliance, interconnection queue studies, and OEM model validation — EMT studies in PSCAD, delivered PE-stamped and built for grid-operator acceptance.
Facility power studies in SKM / ETAP for data centers, industrial plants, hospitals, and campuses — the recurring studies OSHA, NFPA 70E, and NEC 110.24 already require.
Not sure which line you need? Data centers usually need both. Send either — we will sort it out on the call.
Three steps from first email to a deliverable you can audit line by line. No open-ended engagements, no black boxes.
Mostly listening: your deadline, your queue position, your study backlog. If we are not the right fit, we say so on the call — not after a month of scoping.
A clearly bounded scope of work with deliverables, assumptions, and timeline named up front — so you know exactly what you are getting before you commit to anything.
Start with one study. Every assumption, setting, and result is auditable line by line, and every study is delivered PE-stamped. Decide on evidence, not promises.
If you own, build, or maintain power infrastructure with a study standing between you and a deadline, that is us.
Write to us directly. A plain email with your project and your deadline is all it takes.